The team at Style Plus Renovations look at 3 facts about recladding and the Style Plus recladding process. These cover advantages of house recladding and council requirements:
House Recladding Renovation.
Building & Resource Consent.
Plans & Building Consent.
STYLE PLUS | RENOVATIONS FOR FULL CONTRACT RECLADDING IN WEATHERBOARD AND MODERN PLASTER SYSTEMS
Book your consultation today and kick-start your renovation project!
Recladding refers to the process of replacing the exterior cladding or siding of a building. Here are 3 facts about recladding:
1. House Recladding Renovation
2. Building & Resource Consent
3. Plans & Building Consent
1. House Recladding Renovation
ADVANTAGES OF HOUSE RECLADDING
If you decide to embark on recladding your home you will have the opportunity to create a completely new look to your home. You can modernise, and make additions or alterations which can have an effect on the value of your home.
The following are a few examples of the advantages of recladding:
Identifying and repairing any damage to framing, flooring, linings, balustrades, or waterproof decks.
The opportunity to upgrade to the current Building Code external moisture requirements and to apply current E2/AS1 details that include incorporating a cavity system.
The opportunity to change the cladding type, for example, replacing monolithic cladding with weatherboards.
The opportunity to treat sound untreated timber while the framing is exposed.
The opportunity to review and replace replace flashings with those meeting current E2/AS1 requirements.
The opportunity to change the internal layout of the house or make internal changes.
2. Building & Resource Consent
BUILDING & RESOURCE CONSENT
You do not need to apply for resource consent to undertake house recladding work. However, your building consent application will be subject to more intensive inspections compared with other applications by the council.
A general cautionary note, if you do proceed with re-cladding work without having been granted a building consent, the Council will issue you with a stop-work notice and require you to obtain the necessary consents before the work is able to continue.
Tip: It does take time to get drawings completed by the architect and to obtain building consent.
3. Plans & Building Consent
PLANS & BUILDING CONSENT
To acquire a building consent the design documentation must be created with sufficient information and detail to show that the proposed house will meet the performance requirements of the Building Code.
For example, the documentation must clearly show how the house will keep water out by specifying such things as ground clearances, balcony and deck details, cladding system to be installed, joinery and flashing detail.
Whilst all information regarding 3 facts about recladding is considered to be true and correct at the date of publication, changes in circumstances after the time of publication may impact the accuracy of the information. The information may change without notice and Style Plus is not in any way liable for the accuracy of any information printed and stored or in any way interpreted and used by a user.
About recladding, well, the recladding renovation process is not as complicated as some people think. In this second article, the Style Plus Renovation team takes a holistic view of the process and looks at 8 things you should know about recladding
Get started with a Free Architects Renovation Feasibility Report
Tel us about your renovation project and we’ll call you back for a no-obligation chat about your ideas.
Alternatively, if you prefer, we can initially set up a meeting using Microsoft Teams or Zoom (and other meeting apps) for a no-obligation chat about your ideas.
We look forward to hearing from you to discuss your project and get you started on your renovation journey.