With increasing shortages in suburban residential land, ‘knockdown rebuild Auckland‘ is a growing trend. A knockdown rebuild has many advantages over moving your family to a new suburb or renovating and extending an existing home.

The team at Style Plus Renovations Auckland look at 5 things to consider if you are looking at a knockdown and rebuild:

  1. Is this the best option to build?
  2. Why choose knockdown and rebuild?
  3. What are the overheads?
  4. Do I require resource or building consent?
  5. Residential Building Warranty.

can3A knockdown rebuild option is fast becoming more popular due to a shortage of land in residential suburbs. Many older homes on valuable and sought after land do not offer modern integrated family spaces with good construction techniques and energy efficiencies.

Knockdown and rebuild means that you do not have to work around existing structures and you do not have to compromise.

If the existing house is structurally in a bad way, there is a likelihood that knockdown rebuild will be a lot cheaper and easier than trying to renovate it.

knockdown rebuild will enable you to stay in your current location. This provides minimal family disruptions and no need to change schools or re-establish your family in a new neighbourhood.


Tip:
Deciding on whether to renovate or rebuild is a big decision and an expensive one. Whichever way you go, it is vital to do your homework or speak with a knowledgeable and experienced builder such as Style Plus, first.

can4 A knockdown and rebuild suits homeowners who are not content with:

  • A large renovation with quotes that are fast approaching what a new home build would cost.
     
  • A design | floor plan that does not suit the family’s lifestyle.
     
  • Earlier construction, materials, or techniques that do not incorporate items such as double glazing or underfloor heating.
     
  • A sited home that has no environmental benefits or poor natural light.

can5 When you knockdown rebuild there is always the overheads to consider. The following are a few examples:

  • Will you require temporary accommodation | rental for the period of construction? If rental or temporary accommodation is required then this cost should be added to the overall build budget.
  • What is the cost of demolition? Demolition costs do vary and it is advisable to acquire three quotes and compare ‘Apples for Apples’.
  • Is your home a heritage listed building?
  • What is the cost of new services? Generally, a site that has been demolished will require new services. For example, new drainage to be laid, new water mains and electricity supply to the new home.
cna6

If you intend to demolish or remove a building or structure from your site you will require a Building Consent unless it meets the Schedule 1 exemptions:

• A building consent is not required for the following building work: The complete demolition of a building that is detached and is not more than 3 storeys.

• You will need a building consent to build your new home. Your architect|designer or builder can do this on your behalf.

Tip: A resource consent will be needed if any part of your property development breaches District Plan rules. At any point before you submit your application, the council can provide guidance as part of its pre-application meeting service.

06

Building a new home is one of the biggest investments you will make so it is important to have a building warranty which protects you both during construction and for 10 years after completion.

Our Residential Building Warranty provided by Stamford Insurance, which has the surety of being underwritten by Lloyds, has been designed to cover any type of new development, from individual homes to larger sub-divisions and multiple housing units.

Stamford Insurance – 10 Year Building Warranty.

Whilst all information is considered to be true and correct at the date of publication, changes in circumstances after the time of publication may impact on the accuracy of the information. The information may change without notice and Style Plus is not in any way liable for the accuracy of any information printed and stored or in any way interpreted and used by a user.

Colour Design Part One

COLOUR DESIGN PART ONE COLOUR TRENDS FOR 2015/16 Colour Design Part One. Colour is the catalyst that can define the space and create the magic

Building Contract Terms

BUILDING CONTRACT TERMS BUILDING CONTRACT TERMS From 1 January 2015, building contractors will be required to provide written contracts, providing information on their relevant skills,

Minor Variations During Your Renovation

MINOR VARIATIONS DURING YOUR RENOVATION The Building Act 2004 Section 45A enabled Building Consent Authorities (BCAs) the ability to grant minor variations during construction without

Get started with a Free
Architects Feasibility Report

LET'S START

YOUR PROJECT

To contact us complete the form and we will respond to inquiries within 2 business days. We look forward to hearing from you.

When we meet with you we will cover the following:

01 How Style Plus Renovations work
02 Your needs 
03 Timeframes
04 Next steps

BOOK YOUR
CONSULTATION TODAY!

    Select when to be contacted*
    I Would Like To Receive Home Improvement Advice And Inspirational Ideas

    I Would Like A FREE Architectural Feasibility Report